Title
Approve the Scope of Work for the Raw Water Line Replacement Design Engineering
Summary
The City needs to improve the reliability of our Raw Water Pipeline which brings fresh water from our surface intakes to our Water Treatment Plant. This project includes the engineering design and the construction of four (4) phases of pipeline replacement. The FY 2018-2019 budget set aside $400,000 from the Water Enterprise Fund Account No. 651 for the design engineering of the entire raw water system, and $682,000 for the first phase of construction. Public Works has prepared for Council review the scope of work of the proposed Request for Proposals (RFP) for the design of all phases.