Title:
|
Receive a Report, Conduct a Public Hearing, and Consider Approval of a Coastal Development Permit 9-24 (CDP 9-24) and Design Review Permit 12-24 (DR 12-24) for the construction of: 1) a new 960 SF Bio-Solids Dryer Building which would be constructed in the same footprint as the existing Bio-Solids Dryer Building: 2) a new 5,000 SF Bio-Solids Storage Building, which would be constructed on the concrete pad of the now decommissioned secondary biofilters; and 3) and installation of a solar PV system which would consist of two modules of 6,250 and 10,850 SF each at 281 Jere Melo St. (101 West Cypress St.); Mitigated Negative Declaration and Mitigation and Monitoring Reporting Plan
|